Hello,
This is my (Dave here) first official post on our blog so please bear with me as I ramble on. I thought I'd start with what is new internally, what's being built, and anything else that comes to mind that I feel might be of interest.
The latest news from HDB is that we now officially have an interior design department. Mary Turney has joined our staff full time to assist clients with product selections and colors, and she can also work on an individual basis with simple color consultations, or full interior layouts and elevations. We'll be bringing on one more interior designer as soon as demand requires.
As for what's in construction currently, we're a week into a complete kitchen remodel, which should be wrapped up September 9th. We've also got a couple major addition/ renovation projects, one of which includes a master suite addition as well as changing out all of the interior trim and making the interior doors 3 ft in width.
The other is a two story addition onto the back of the house as well as remodeling the kitchen and adding a bathroom downstairs off of the new master bedroom. (see photo)
The other project in construction is an interior remodel of a kitchen, where we relocated a stair leading to the basement and opened up the kitchen to the dining and family rooms. This was a very challenging design, but will be absolutely beautiful when it's completed.
That's all for now. If you have any questions or comments, we'd love to hear from you.